描述
About Us
The course of development
  • Populus fujianensis

  • Shanghai Jinyang

  • Jiangsu Jinyang

Fujian Jinyang Technology Co., Ltd.
Fujian Jinyang Technology Co., Ltd. was established in 2012. Its main business is precision structural parts and raw materials for lithium batteries and alkaline batteries. Its products are mainly precision structural parts for cylindrical batteries, steel shells, bottom covers, battery binders, and battery basic materials. Nickel plated steel strips, etc. In 2024, the company's battery parts production capacity will exceed 7.7 billion units, and the output value will exceed 600 million yuan. It has become one of the largest manufacturers of cylindrical battery parts and raw materials in the country. The company develops jointly with leading companies in the battery industry such as Yiwei Lithium Energy, South Korea LG, Jiangsu Tianpeng, Japan Matsushita, Lishen, Nanfu Battery, and Shuanglu Battery, providing supporting facilities for leading companies in the battery industry. The products are widely used in energy storage batteries, power tools, daily consumption and other fields. The company has been rated as "National High-tech Enterprise","National Specialized and New Little Giant Enterprise","National Green Factory","National 5G Factory","Fujian Province Manufacturing Individual Champion Enterprise", and "Fujian Province Enterprise Technology Center". The company's R & D capabilities and industrial scale have been widely recognized.
描述
Shanghai Jinyang Metal Surface Treatment Co., Ltd.
Shanghai Jinyang Metal Surface Treatment Co., Ltd. was established in 1993, covering an area of 20 acres. It holds the first domestic patent for deep blind hole plating process for cylindrical battery shells. This technology has contributed to the impact of the localization of battery steel shells. At the same time, Jin Yang independently developed battery-specific gelling agents: polyacrylic acid and sodium polyacrylate, which have become the materials of choice for imported substitutes. In September 2024, the construction of a standard factory building of 31,000 square meters will be started, supporting infrastructure such as power, environmental protection, transportation, and greening. A research and development and production base for new energy, green and environmentally friendly battery structural parts will be built. The project is planned to be constructed from 2024 to 2027, with a total planned investment of 450 million yuan. After full completion, it will have an annual production capacity of 1.5 billion sets of 18650/21700/46 series battery steel shells and bottom covers.
描述
Jiangsu Jinyang Technology Co., Ltd.
Jiangsu Jinyang is scheduled to start restructuring in December 2022. It is a deep processing base for high-purity graphite and related products. According to customer needs, it can provide 500-1800 meshes of high-purity graphite powder and expanded graphite powder. It is also planned to build a comprehensive new energy industrial park in stages by 2030. It is planned to build a standard factory building of 200,000 square meters, supporting infrastructure such as electricity, steam, environmental protection, transportation, and greening to form a comprehensive industrial park integrating the production of precision structural parts for new energy batteries, special materials for new energy batteries, and environmentally friendly alkaline battery structural parts. The project is planned to be constructed from 2023 to 2031. The total planned investment of the project is 1.7355 billion yuan, which is divided into three phases. After all production reaches production capacity, it will have a production capacity of 4.5 billion battery precision structural parts and 60,000 tons/year for new energy batteries. Special material production capacity. The annual output value of the project is expected to exceed 2.3 billion yuan, and the annual profits and taxes exceed 130 million yuan.
描述
<
>